September's minutes

Open forum - hide your email address if you are bothered about security
dr.syn
Top poster
Posts: 1229
Joined: Sat Dec 29, 2007 10:50 pm

September's minutes

Unread post by dr.syn »

Hi all, just reread the minutes and would like to bring up 3 points.
1 piel moorings - the deep water one chafed through my cable, it was a strong good rope and I assume that there must be rusty edges on the eye. It was a bad night and it took a bit of hammer but in saying that, it still frayed the cable so please check before you use it again.
2 security, the new gate. The style should be removed also. A style usually means a footpath.
3 merlo repair. Could whoever is tasked with the repair to the EMS please put a note on the forum as to when it is out of action so no one has a wasted journey if they want to sail and can't use the JCB
Cheers, keep safe
I spent most of my money on Booze, Women and Boats. The rest I wasted.
We're born naked, wet and hungry - then things get worse
Post Reply